Production Test
From Openmoko
(Difference between revisions)
(→Production Test Introduction) |
|||
Line 1: | Line 1: | ||
== Production Test Introduction == | == Production Test Introduction == | ||
− | After device finish engineering prototypes stage, hardware engineer will need to provide test specification and pass criteria base on the product specification. | + | After device finish engineering prototypes stage, hardware engineer will need to provide test specification and pass criteria base on the product specification. Production test also could be treated as a simplified regulatlation test, because it has to fulfill standard of worldwide standard (for example: GSM) of local regulation (for example: Wi-Fi). |
== Test flow == | == Test flow == |
Revision as of 08:12, 1 May 2008
Contents |
Production Test Introduction
After device finish engineering prototypes stage, hardware engineer will need to provide test specification and pass criteria base on the product specification. Production test also could be treated as a simplified regulatlation test, because it has to fulfill standard of worldwide standard (for example: GSM) of local regulation (for example: Wi-Fi).