View source for Production Test
From Openmoko
You do not have permission to edit this page, for the following reasons:
You can view and copy the source of this page:
Return to Production Test.
You do not have permission to edit this page, for the following reasons:
You can view and copy the source of this page:
Return to Production Test.
After device finish engineering prototypes stage, hardware engineer will need to provide test specification and pass criteria base on the product specification. Production test also could be treated as a simplified regulatlation test, because it has to fulfill standard of worldwide standard (for example: GSM) of local regulation (for example: Wi-Fi).
Ususally production test including 3 major parts:
Target of PCBA test is make sure the surface mount quality and the main component works properly
Usually a production will include attached modules, and connected with FPC (flexable plastic cable) or connectors, pre-assembly test will test system function with module attached
After assembly is final product test, all major function need to be verified before product shipping.