Production Test

From Openmoko

(Difference between revisions)
Jump to: navigation, search
 
(Production Test Introduction)
Line 1: Line 1:
 
== Production Test Introduction ==
 
== Production Test Introduction ==
  
After device finish engineering prototypes stage, hardware engineer will need to provide test specification and pass criteria base on the product specification.  
+
After device finish engineering prototypes stage, hardware engineer will need to provide test specification and pass criteria base on the product specification. Production test also could be treated as a simplified regulatlation test, because it has to fulfill standard of worldwide standard (for example: GSM) of local regulation (for example: Wi-Fi).
  
 
== Test flow ==
 
== Test flow ==

Revision as of 07:12, 1 May 2008

Contents

Production Test Introduction

After device finish engineering prototypes stage, hardware engineer will need to provide test specification and pass criteria base on the product specification. Production test also could be treated as a simplified regulatlation test, because it has to fulfill standard of worldwide standard (for example: GSM) of local regulation (for example: Wi-Fi).

Test flow

Device

GTA01

GTA02

Process flow

Device Module Test 1 (DM1)

Device Module Test 2 (DM2)

Personal tools

Production Test Introduction

After device finish engineering prototypes stage, hardware engineer will need to provide test specification and pass criteria base on the product specification.

Test flow

Device

GTA01

GTA02

Process flow

Device Module Test 1 (DM1)

Device Module Test 2 (DM2)